The UK needs more cooling. Are we planning the infrastructure for it?
Hotter summers are changing what UK buildings need from their energy systems. Explore how heat pumps can support future heating and cooling requirements.
You’ve invested significant time, money and effort into decarbonising your heating. You should be able to rely on it to keep your buildings comfortable and operate efficiently.
Even well-planned systems can face challenges in operation
Are your buildings struggling to stay warm, despite having a new heating system?
Are your running costs higher than anticipated, leaving you questioning whether your investment is paying off?
Or are you simply unsure whether your heating is operating as intended?
If any of those concerns sound familiar, HI Group is here to help. We work with you to understand how your system is performing, investigate any issues and find a practical way forward.
When everything looks right on paper
A heating system can meet its original design specifications, pass commissioning checks and receive all the necessary certifications, but still encounter difficulties under real operating conditions.
These issues become particularly challenging during colder weather, when buildings rely most heavily on their heating systems. The causes aren’t always obvious, and finding a solution may involve looking beyond the equipment itself to understand how it interacts with the wider building.
For those responsible for managing public sector estates, this can mean considerable time spent investigating concerns, responding to occupants and seeking support, often without a clear explanation of what’s going wrong.
Finding the right solution for your building
Drawing on extensive experience in low-carbon heating, HI Group is uniquely placed to assess and improve existing installations, regardless of who designed and installed them.
Our team works with you to understand your concerns and develop a practical plan tailored to your building’s needs.
1. Understand your system
Carry out an initial audit to compare your heating’s actual performance against its original design objectives.
2. Review the findings
Investigate any areas of concern and examine factors affecting heating output, energy consumption and running costs.
3. Put solutions into practice
Recommend and implement appropriate measures, exploring opportunities for immediate improvements alongside longer-term solutions.
4. Monitor and support
Evaluate the impact of any changes and provide ongoing technical support to help ensure lasting results.
A proven track record on public sector estates
HI Group takes a whole-system approach to decarbonisation, considering existing infrastructure, operational requirements and how different technologies work together. We’ve put this approach into practice on many public sector estates, helping organisations achieve measurable energy and carbon savings.
Our public sector work in numbers
PSDS-funded projects successfully delivered
Total energy offset
Total carbon emissions saved
Delivering decarbonisation at scale
Our projects show how different low-carbon technologies can be integrated to meet the needs of complex public sector estates.
Project One
Multi-technology decarbonisation
Estate: A live, multi-building estate with approximately 8,500 occupants
Technologies: Solar PV, solar PVT, air source and ground source heat pumps, battery energy storage and heat network
3,550 kW
Total capacity
4.5 million kWh
Total energy offset
780 tCO₂e
Total carbon saving
Project Two
Low-carbon heating and energy storage
Estate: A complex estate with over 5,000 occupants across 11 buildings
Technologies: Air source heat pumps and battery energy storage
1,820 kW
Total capacity
2.1 million kWh
Total energy offset
391 tCO₂e
Total carbon saving
Project Three
Integrated heating and renewable energy
Estate: Live, multi-building estate housing 16,000 occupants
Technologies: Solar PV, air source heat pumps, battery energy storage and heat network
1,450 kW
Total capacity
1.6 million kWh
Total energy offset
303 tCO₂e
Total carbon saving
Whether you’re dealing with a persistent issue or want to better understand how your system is operating, HI Group can help you determine your next steps.
Tell us a little about your installation and what you’d like support with, and we’ll be in touch to talk about your options.
Alternatively, get in touch with us directly:
Hotter summers are changing what UK buildings need from their energy systems. Explore how heat pumps can support future heating and cooling requirements.
Learn how an engineering-led investigation uncovered system conflicts, improved operational performance and identified opportunities to reduce annual gas consumption by up to 33%.
Discover how HI Group helped MidKent College replace gas heating, install renewable energy systems and deliver large-scale estate decarbonisation across two campuses.